The distributed generation power plant of Eshtehard industrial town has been established in order to supply electricity to the country's second largest industrial town in Alborz province with a production capacity of 26 megawatts.
One of the reasons for choosing the power plant construction in Eshtehard industrial town is the demand for electricity consumption and the expansion of this consumption in the coming years in line with the country's industrial development.
Also, one of the other reasons for choosing this location is access to the main gas transmission lines and proximity to the transmission network and electricity distribution substation, which was important in the economic justification of this plan.
The design and construction of this power plant was realized with the power of Iranian experts and workers in a short period of one year, and since the beginning of 2017, the process of electricity production and distribution of this power plant has been completed in line with the development and creation of employment in Eshtehard industrial town.
This power plant has been completed in the conditions of economic sanctions and commercial restrictions, which will indicate smart management, improve knowledge and operational capacity, and lay the groundwork for industrial development and value creation.
We are proud that in the fourth decade of the holy system of the Islamic Republic of Iran, by honoring the huge capital of the country's young and educated human resources, which are the main support for the production of Iranian goods, we have provided the necessary infrastructure for this.
Project information
- LocationEshtehard industrial town in Alborz province
- Capacity26 MW
- execution timeOne year
- operation1397
- Operation period24 years